Map 1 - Built Up Area (1)
| Built-up Area |
Map 1 - Intensification Corridor (2)
Map 1 - Designated Greenfield Area (3)
| Designated Greenfield Area (DGA) |
Map 1 - Major Transit Station Area (4)
| Major Transit Station Area (MTSA) |
Map 1 - Strategic Growth Area (5)
| Strategic Growth Area (SGA) |
Map 1 - Urban Growth Centre (6)
| Urban Growth Centre |
Map 1 - Employment Area (75)
| Employment Area |
Map 2 - Waste Disposal Assessment Area (8)
| Waste Disposal Assessment Area |
Map 2 - Extractive Industrial (9)
| Extractive Industrial |
Map 2 - Defined Policy Areas (10)
| Defined Policy Area |
Map 2 - Applications Before the Ontario Municipal Board (11)
| Application Before the Local Planning Appeal Tribunal (LPAT) |
Map 2 - Land Use (12)
| Neighbourhood Area |
| Medium Density |
| High Density |
| Strategic Employment and Economic District (SEED) |
| Commercial District |
| Community Hub |
| Employment Area - Non Industrial |
| Employment Area - Industrial |
| Employment Area - Restrictive Industrial |
| Natural Heritage System |
| Greenspace |
| Infrastructure and Utility |
Map 3 - Watercourse (64)
Map 3 - Special Policy Area (14)
| High (S) Constraint Stream Corridor –Special Policy Area |
Map 3 - Natural Linkage Area and Natural Core (15)
| Natural Core |
| Natural Linkage Area |
Map 3 - Constraint Stream Corridor Area (16)
| High Constraint Stream Corridor Area |
| High (S) Constraint Stream Corridor Area - Special |
| Medium Constraint Stream Corridor Area |
| Low Constraint Stream Corridor Area |
Map 3 - Natural Hertiage Resource Classification (17)
| EPA - Level 1 |
| EPA - Level 1 with Existing Development Designation Subject to 5.4.2.1.d |
| EPA - Level 2 |
| EPA - Level 3 |
Map 4A - Cycling Network (19)
Map 4B - Transportation Features HOV (22)
| Transit Priority Features |
| HOV (leftmost lane) (MTO 2017 Transportation Environmental Study Report) |
| HOV (rightmost lane) |
| Protected HOV beyond 2041 (rightmost lane) |
Map 4B - Road Classification (23)
| Provincial Highway |
| Arterial |
| Existing Highway Interchange |
| Proposed Highway Interchange |
| County Road |
| Local Road |
| Major Collector |
| Minor Collector |
| Parkway |
Map 4B - Freight Supportive Corridor (24)
Map 5 - Road Right Of Way (27)
| 18 m |
| 20 m |
| 23 m |
| 24 m |
| 25 m |
| 26 m |
| 27 m |
| 29 m |
| 30 m |
| 34 m |
| 38 m |
| 40 m |
| 41 m |
| 43 m |
| 45 m |
| 46 m |
| 47 m |
| 48 m |
| 49 m |
| 50 m |
| 54 m |
| 56 m |
| 60 m |
Map 6 - Waterfront (30)
Map 6 - Storm Pond (63)
Map 6 - Parks - Gathering and Celebrating Space (31)
Map 6 - Parks - Greenspace (32)
| Unprogrammed Greenspace |
Map 7 - Transportation Pathway (35)
Map 7 - Significant Groundwater Recharge Area (36)
Map 7 - Highly Vulnerable Aquifer (37)
Map 7 - Intake Protection Zone (38)
| Intake Protection Zone 1 |
| Intake Protection Zone 2 |
Map 7 - Issue Contribution Area (39)
| Issue Contributing Area Well 11, 12, 14 Chloride and Sodium |
| Issue Contributing Area Well 3A Chloride |
| Adjacent Well Field WHPA |
Map 7 - Wellhead Protection Area (40)
| WHPA - A (100m radius offset from operational municipal well) |
| WHPA - B (2 year capture zone) |
| WHPA - C (5-10 year capture zone) |
| WHPA - D (25 year capture zone) |
Map 8 - Major Gateway (42)
Map 8 - Historic Streetscape Corridor (43)
Map 8 - Historic Neighbourhood Boundary (45)
Map 8 - Treaty Land (46)
| Treaty 16, 1815 |
| Treaty 18, 1818 |
| Williams Treaty, 1923 |
Map 8 - Historic Neighbourhood Boundary (47)
Map 3 - Watercourse (50)
Appendix 1 - NVCA Regulation Limits (69)
Appendix 1 - LSRCA Regulation Limit (68)
Appendix 1 - NVCA Floodplain (70)
Appendix 1 - LSRCA Floodplain (71)
Appendix 1 - Conservation Authority Boundaries (73)
| LSRCA |
| NVCA |
Railway Line (58)
Waterbodies (59)
City Boundary (60)
Neighbouring Municipalities (61)
|