IIP Road Projects (1)
| Harvie/Big Bay Point Overpass |
| Grade Seperated Crossing |
| McKay Interchange |
IIP Infrastructure Projects (2)
| Decommission Pump Station |
| Pump Station |
| Reservoir |
| Surface Water Treatment Plant |
| Water Tower |
Infrastructure Project Linear (3)
| Roads_City |
| Sewer_City |
| Watermain_City |
| Road_Developer |
| Sewer_Developer |
| Watermain_Developer |
| Trails_Developer |
| Trails_City |
Active Planning Applications (4)
Settlement Area (Pre-2031) (5)
| Pre-2031 |
| Post 2031 |
Secondary Plan Boundary (6)
Schedule A - LandUse - OfficialPlan (7)
| Residential |
| Mixed Use Nodes and Corridors |
| Highway 400 Industrial |
| General Industrial |
| Open Space |
| Environmental Protection Area |
| Special Rural Area |
Infrastructure Project Linear (8)
DraftParcels_June2017 (9)
DevelopmentPhases (10)
| Phase 1 |
| Phase 2 |
| Phase 3 |
| Phase 4 |
| Post 2031 |
DraftParcels_Overlay (11)
|